Hospital Redevelopment – Taranaki | Asbestos Demolition Survey & Air Monitoring

Project name: Hospital Redevelopment Site: Taranaki Project overview:  Thomas Consultants Ltd (TCL) was engaged to provide asbestos demolition surveying services as part of a development for a new health facility in Taranaki. Fully intrusive demolition surveys were conducted on a former laundry building with a total floor area of 2000 square metres including services tunnels. Following surveying works,…

Carrington Road Housing Development | Asbestos Assessing and Surveying

Project name: Carrington Road Housing Development Site: Carrington Road, Mount Albert Project overview:  Thomas Consultants Ltd (TCL) was engaged to provide asbestos demolition surveying services as part of what could be New Zealands largest urban housing development in Mount Albert, Auckland. Fully intrusive demolition surveys were conducted on 15+ commercial and education buildings with total floor area…

Heron Ship Repair – Asbestos Assessing and Surveying

The Client: Heron Ship Repair Limited The Site: Port Road, Whangarei The Project: Heron Ship Repair Limited engaged Thomas Consultants Ltd (TCL) to provide Asbestos Assessor services during removal of super-6 cladding and roofing from their winch house. TCL reviewed the contractor’s removal methodology and asbestos removal control plans (ARCP). During removal works, Thomas Consultants…

City Rail Link (CRL) / Link Alliance

Client name: City Rail Link (CRL)/Link Alliance Site: Mount Eden, Karangahape Road and Albert Street Station Developments Project overview: CRL engaged Thomas Consultants Ltd (TCL) to undertake full asbestos demolition surveys of 45+ commercial and residential buildings and compile a scope of works for removal of both friable and non-friable asbestos containing materials (ACM) from these buildings. Following this, TCL reviewed contractor removal…

Major Facilities – Asbestos Management

Client: Private Client Site: Whenuapai, Devonport and Papakura Project Overview: Thomas Consultants have been engaged to act as the principal asbestos consultant for a major facilities management contractor, which provides services on secure sites. Services Provided: Asbestos management, refurbishment and demolition surveys Compile scope of works for asbestos removal Review contractor removal methodologies and asbestos…

Tertiary Education Facility – Asbestos Surveys

Client: Public Sector Site: Mt Albert Project Overview: Thomas Consultants undertook asbestos surveys on all campus buildings which ranged from small single-story buildings to large multi-storied buildings including libraries, trades buildings and lecture theatres. This was an operational campus and thus our methodology took into account the sensitive nature of the site to ensure the…

Major Housing Development – Asbestos Management

Client: Public Sector Site: Hobsonville Point Project Overview: Thomas Consultants were engaged to act as the principal contamination consultant and remediation specialist for a major residential development project at Hobsonville Point, Auckland. Services Provided: Fully intrusive asbestos surveys Compile scope of works and tender documents Engineer to the Contract Review contractor removal methodologies and asbestos…

Underground Rail Project – Asbestos Management

Client: Public Sector Site: Mt Eden and K-Road Project Overview: This project involved the identification of all asbestos containing materials (ACM) for all buildings to be demolished as part of enabling works. Thomas Consultants has also been engaged to conduct air quality monitoring during removal, supervise removal works, issue clearance certificates and supervise contaminated soil…

Classroom Relocation Programme

Thomas Consultants has provided various asbestos survey and testing services for education providers as part of their classroom relocation programme. Prior to the relocation of classrooms in primary and high schools in the Auckland region, Thomas Consultants was contracted to conduct asbestos surveys and prepare asbestos management plans. These management plans determined the feasibility of…